Steve Talbott’s involvement consisted of:
BIM Modeling & Coordination
- Developed detailed electrical models for Fab, CUB, and support buildings using Revit and AutoCAD workflows.
- Integrated power distribution, lighting, and low-voltage systems into coordinated BIM environments.
- Collaborated with MEP teams to ensure clash-free routing and spatial compliance with cleanroom protocols.
Electrical Calculations
- Performed load analysis, voltage drop, and fault current studies for critical systems.
- Supported breaker coordination and panel schedules for high-reliability uptime.
Field Services & RFIs
- Responded to RFIs on conduit routing, fixture mounting, and equipment clearances.
- Conducted field walks to verify constructability and resolve installation conflicts.
- Issued redlines and drawing updates based on evolving site conditions.
Clash Detection & Resolution
Coordinated with structural, HVAC, and process teams to resolve spatial conflicts.
Led electrical clash detection using Navisworks and BIM 360 workflows.
Project summary:
GlobalFoundries Fab 2 – Contract Scope (2014)
Systems: High-purity chemical delivery, HVAC, electrical distribution, ultra-pure water, and waste treatment
General Contractor: M+W Zander (now Exyte)
Contract Value: ~€550 million (~$817 million USD)2
Location: Luther Forest Technology Campus, Malta, NY
Facility Overview:
Fab 2, Module 1: 300mm wafer fabrication facility at the 28nm node
Buildings: Wafer Fab (Class 100 cleanroom)
Spine Support, Admin Office, Central Utility Building (CUB)
Total Area: ~1.45 million sq ft across four major structures
Systems: High-purity chemical delivery, HVAC, electrical distribution, ultra-pure water, and waste treatment